Cone Zone
- From June 16 to September 5, 2025, the sidewalk between the VAC complex and the CU Museum will be closed for the start of demolition and repair of the VAC bridge.
- Construction of the Colorado Highway 119 Safety, Mobility and Bikeway Improvements Project has started and will be ongoing through 2027. Once complete, the corridor will have improved bike and bus facilities, and safer and more efficient
- Construction has begun for the on campus Limelight Hotel Boulder. The Limelight Conference Center and Hotel at the 1400 block of Broadway will fill the gap in large conference space in the City of Boulder. With approximately 250 rooms and a 15,
- Residence One will be the first new, modern housing building to open in the area, North Boulder Creek (NBC). It will house 332 upper division students in on-campus apartment-style housing. It will provide neighborhood amenities such as a café, UPS
- In 2021 a structural assessment of the building was completed by a structural engineer. A/E team is currently developing a design to address the recommendations of the report. The scope of work being evaluated consists of: a full structural
- On May 31, 2024, at 5 p.m. the Leonard H. Gemmill Engineering, Math & Physics Library, located in the Mathematics Building, will close for renovations. Our timeline for reopening right now is summer 2025. These renovations are needed to restore
- A major construction project is planned for the UMC in spring and summer 2026. Construction will improve the HVAC system, Campus Dining Services loading dock and pavement between the UMC and CASE buildings